The fluidity of the traffic
|

9 f Car bunch maintained for at least 40 kilometers since leaving the ferry, and it goes on... the ferry fever. |

0 f Ferry struggling in ice .This situation may generate many hours delays and sometimes when stuck in ices the ferryboat is deported in the river |

5 f Baie-Ste Catherine: Some visitors, puzzled by the end of the road or the line-up, turn back westward without reaching the North Shore |
| |

2 f Queueing up for kilometers, waiting for the ferry . This happens anytime but mostly on 3 days week-ends or when ice fill in the Saguenay.Photo M.S |

1 f Many hours lost waiting for the ferry in Baie-Ste Catherine QC Photo M. Savard |

6 f Tadoussac: Prisoner of a bunch of cars downhill, more than 70 vehicles may go before you. |
| |

8 f A trailer-truck boarding the ferry-boat. |

7 f Ferry-boat: A bunch of car in development, up to 75 vehicles to enhance the ferry fever. |

4 Safety:Ferry fever: 50 km after leaving the ferry-boat, drivers are still trying to get out of the bunch of cars. |
| |

13 f Quebec Transport Department agent trying to manage the traffic jam. |

11 Important investments in the region induce heavy transport. |

12 f Traffic jam ;Waiting for the ferry in the Tadoussac slope. |
| |

3 f Tadoussac;That trailer-truck coming out of the ferry-boat will induce an important car bunch which could reach 70 vehicles. |

16 f Ferry fever; Impatient driver on the wrong way in the curve at the top of the Tadoussac slope. |

15 f Excessive waiting induces u-turns to go back home or to travel via Saguenay (1.5 hour). |
| |

14 f The fog prevents the third ferry to work, inducing another important traffic jam |
|
| |
| |
The safety
|

5s Safety: A ferryboat waits until the other leaves when three boats operate simultaneously in summer. |

7 s Safety: A truck driver must step over the next vehicle to reach his own. |

6s Safety: Trying to reach the WC,walking in limited spaces between dirty vehicles ; a factor among others to enhance ferry fever. |
| |

8 s Baie Ste Catherine: Beacons on road 138 to protect pedestrians near the whale cruises wharf. |

9 s Ferry fever: Initiative to prevent. |

10 sTadoussac: Down the Tadoussac slope.Vehicles waiting while others leave the boat. |
| |

23 s Difficult to open the door without knocking the car next to your vehicle or the boat itself. |

22 s Safety: Ferry fever. The funnel effect while coming out of the boat on both sides of the river.Who will pass first? |

21 s Tadoussac:Trailer trucks and pedestrian on the public road. |
| |

11 s Ferry-boat: Pedestrian walking among vehicles coming in.. |

13 s Safety: Enlarging the photo, one can notice a boat and kayaks seen from the ferry-boat. |

17 s Mooring handling on the ferry-boat. |
| |

4 s Downhill in Tadoussac and the emergency ramp for vehicles in difficulties. |

19 s A trailer truck climbing the Tadoussac hill (road 138) |

3 Top of the hill in Tadoussac a slope 1.5 km long reaching a gradient of 10%. Check your brakes... |
| |

20 s Part of the Tadoussac village down the 1.5 km long slope reaching a gradient of 10%. |

2 Safety; The ferry fever: Increasing year after year with the growth of the traffic . |

12 s Ferry-boat; The place indicated by the staff will establish the importance of the bunch of car that will precede you when coming out. |
| |

15 s Tadoussac wharf ,some years ago.One can visualize the lack of options for a vehicule rushing down. |

16 s Wave breaking in front of the ferry boat. |
|
| |
| |
The environment
|

12 e These trucks traveling in the heart of the Tadoussac will induce vibrations, noise , dust and odors in the otherwise quiet village. |

1 Environment: The green house gas and permanent noise of the boat engines , day and night, yearlong. |

18 e Trailer-truck carrying a dangerous product, waiting down the Tadoussac hill. |
| |

3 Environment: Tadoussac; constraints of housing development on scenery. |

4 e Baie-Sainte Catherine: The Pointe Noire: An exceptionnal site which would become easily accessible when the road 138 will be relocated. |
|
| |
| |
The served area
|

2 The Saguenay mouth, Tadoussac, door of the only continental region of Canada still enclosed.;6% of Canadian area or 20 % of Qc plus 72 % of NF |

73 City of Port-Cartier. |

70 Happy Valley Goose Bay; the cityhall. |
| |

48 Sept-Iles: Entrance of the bay , at right the Iron Ore Company facilities and in front, the Alouette Aluminium Plant. |

29 The Quebec North Shore region and the Labrador; a region larger than France which immediate future depends on the Saguenay bridge. |

30 A study is going on to reactivate the old project of a tunnel between Newfoundland and the Labrador. |
| |

23 Tadoussac and the mouth of the Saguenay seen from uphill on the 138. |

42 Manicouagan: The village of Chute-aux-Outardes , in front the Outardes river and in back the Outardes 2 dam and reservoir. |

43 Manicouagan : The montagnais village of Betsiamites, a natives community proud of living in harmony with the environment since thousands of years. |
| |

44 High North Shore: The village of Les Escoumins |

45 Minganie: Beach near the village of Sheldrake |

46 Minganie , the village of Rivière au Tonnerre |
| |

47 Minganie: Havre St-Pierre, Fishingboat and harbour facilities for the Iron and Titanium Company. |
|
| |
| |
Project in reference (1999)
|

69 Project 1999 Buckland and Taylor |

68 An engineering masterpiece which will open the door of canadian north-east. |
|
| |
| |
Project of SNC_Lavalin Genivar (2004)
|

84 SNC Lavalin 2004 project : Proposed crossroad to reach road 138 on the Tadoussac side. |

88 SNC Lavalin 2004 project: Crossroad project N3 to enter directly in the village. |

89 SNC Lavalin 2004 project: Main span surface, a double two lanes road. |
| |

91 SNC Lavalin 2004 Project: Proposed layout for the Baie-Ste Catherine side. |

92 SNC Lavalin 2004 project : Proposed road lay-out for Tadoussac. |

96 SNC Lavalin 2004 project: Projected road lay-outs in Baie Ste Catherine. |
| |

97 SNC Lavalin 2004 project: Projected road lay outs in Tadoussac. |

98 SNC Lavalin 2004 project :Proposed road lay-out in Baie Ste Catherine |

99 SNC Lavalin 2004 project: Proposed crossroad to access the Baie Ste Catherine village. |
| |

90 SNC Lavalin 2004 project: In 1998, the Quebec transport department estimated cost for similar project 50% lower. |

83 SNC Lavalin 2004 Project: Road Lay-out proposed for the Tadoussac side. |

78 SNC Lavalin 2004 project: Wind tunnel tests. |
| |

77 SNC Lavalin Genivar 2004 project : Cross section of the main span |

102 SNC Lavalin Genivar 2004 Project: Plan view. |

101SNC Lavalin Genivar 2004 Project : Elevation downstream side. |
| |

103 SNC Lavalin Genivar 2004 project: South pylon |

103 SNC Lavalin 2004 Project : Animation of the building phases of the bridge |

75 SNC Lavalin Genivar 2004 project: Detail of the suspension cable |
| |

76 SNC Lavalin Genivar 2004 project: Detail of the suspension cable |

74 SNC Lavalin Genivar 2004 project: Detail of the suspension bridge cable. |
|
| |
| |
Other bridge projects .
|

28 The Golden Gate bridge in San Francisco , built in 1937. |

6 The April 25 bridge in Lisboa, longer than the proposed bridge, it has the world's deepest pillars in sea. |

94 Construction phase: Kurushima bridge, Japan. |
| |

95 Construction phase: Kurushima bridge, Japan. |

93 Phase of construction of a bridge similar to the proposed one.Kurushima bridge , Japan. |

1 p Orleans Island Bridge:(1935): Building it today at the same ratio of the GDP in 1935 would cost 850 M$ in 2004. |
| |
| |
Miscellaneous
|

4 Whale cruise leaving the Baie-Ste Catherine village wharf.A majority of tourists limits its visit to the region to a few minutes stop in Tadoussac. |

7 Press conference of the Coalition for improving the Trans Quebec-Labrador highway |

5 Initiative against ferry fever by the Transport Department of Quebec. |
| |

10 Baie-Comeau;Papermill. The Saguenay ferry generates costs over $ 5 millions a year for the North Coastal forest industry. |

59 Avoided costs: Ferry boat and Coast guard; mechanical failure and winter deicing |

61 Car bunches create or increase the ferry fever, as well as many other irritating factors |
| |

65 Baie Ste Catherine ferry wharf before its enlarging |

35 Baie Ste Catherine whale cruise wharf for minute-tourist stopping in Tadoussac for a few shopping then back in Charlevoix. |

32 Canadian North-east : Pop-ups of main communitiesavailable in section The served region, subsection The road network. |
| |
| |
Labrador
|

Construction of a bridge on the Churchill river August 2005 |

Ferry Blanc-Sablon QC to Ste Barbe, NL via Belle Isle Straight 17 km -90 min |

Muskrat falls, future hydroelectric project of lower Churchill . |
| |

Construction of phase 3 of the Trans Labrador highway by the Newfoundland government. |